Articles
A contract has been awarded for the $116 million expansion of a correctional centre in the NSW Hunter region.
Australia’s only vanadium production facility has commenced front-end engineering design and plans to be in production by mid-2020.
A $260m Kimberley mineral sands project is expected to create more than 400 construction and 280 permanent jobs when it the first stage of construction begins next year.
A WA sulphate of potash producer has confirmed plans to build a pilot plant and full-scale production facility after bankable feasibility study shows “exceptional financial outcomes” for its proposed SOP in the Pilbara.
Two neighbouring salt minerals companies have entered into a joint study to determine shared infrastructure costs for their projects.
A WA gold miner will ramp up underground mining operations next year.
A 10-year contract has just been signed for a Bowen Basin coal project.
Projectory breaks down the ten-staged construction plans for the multimillion-dollar transit venue and those currently involved in the project.
The rebuild of a Brisbane CBD bank has five companies vying for the role, Projectory can reveal.
Projectory talks to mine developers for an accurate measure on the project’s current status and how to go about tendering for upcoming works.