Perth
Civil, earthworks and piling contractors are looking at the first packages on a staged power generation, battery storage and grid connection build, with preliminary site investigations and enabling works flagged to begin before the end of this year.
Builders, industrial fit-out contractors, fabricators and manufacturing equipment suppliers have a new entry point into a long-run naval shipbuilding pipeline.
Process, civil, structural, mechanical, electrical and odour control suppliers are being positioned for a new wastewater treatment plant build, after initial funding was released for detailed design, engineering and site preparation.
Builders prequalified for mid-tier government building work have just under a month to price a new two-storey teaching block, with a staged delivery program that runs through to early 2029.
Head contractors, structural and concrete trades, facade suppliers and building services contractors now have a defined residential build moving toward market.
A mid-rise residential and hospitality building has cleared its final design reset, and the supply chain can now position for work on it.
Electrical, mechanical, pipeline and civil contractors have a forward window opening on a brownfield gas-fired firming plant built around multiple fast-start reciprocating engine units.
Head contractors, concrete structure trades, façade installers and building services subcontractors now have a live residential target moving from design into procurement.
Civil, structural, electrical, standby power and mechanical cooling contractors are in line for a staged run of packages on a new two-building data centre development now moving toward site works.
A high-rise residential project has cleared its final planning determination, moving the job out of design review and into the pre-construction documentation phase that precedes builder and trade engagement.