Michael Mapstone
Suppliers to contract mining, civil earthworks and site services packages have a narrowing window to position as an emerging resource project moves out of its development phase and toward a mining start.
Subcontract and supply windows are opening on a staged high-voltage transmission build after the network owner awarded its first round of head contracts across three separate contractors.
Head contractors, structural and concrete trades, facade suppliers and building services contractors now have a defined residential build moving toward market.
Civil, electrical, heavy haulage, crane and site services contractors now have a live wind generation build to target.
A mid-rise residential and hospitality building has cleared its final design reset, and the supply chain can now position for work on it.
Process plant, earthmoving, tailings, materials handling and camp services contractors have a long-life expansion moving toward construction, with a duplicated processing plant and a full suite of supporting site infrastructure now cleared to proceed.
Shoring, bulk excavation, dewatering, concrete structure, façade and building services contractors have a new mid-rise mixed-use residential build moving into the pre-construction pipeline.
High-voltage, electrical installation, civil and heavy haulage contractors have a new storage-sector target, with a utility-scale battery project moving from design into its final pre-decision stage.
A head contractor has been appointed to build fish passage structures at a series of remote river sites, opening near-term subcontract and supply opportunities for rock and quarry suppliers, civil earthworks crews, haulage operators and plant hire providers.
Prequalified bridge and civil head contractors now have a live tender window on a highway bridge replacement, with pricing due in early December and construction targeted for mid-2027.