FEED work to start Q2 CY2020 for $2.2b oil and gas project in North West Shelf
By
,
,
on December 4, 2019
,
,
The basis of design is being finalised for the Front End Engineering and Design (FEED) phase for an oil extraction project of...
To read the rest of this article, please log in using the form below, or sign up now.