Energy & Utilities Projects
Electrical, civil, earthworks, transmission and heavy haulage contractors now have a defined package set to position for, as an energy storage build moves toward a mid-2027 construction start.
Construction activity has commenced on a large-scale battery project, opening near-term exposure for civil, electrical, construction, equipment and specialist service suppliers.
Contractors across underground civil works, HDD, cable installation, electrical infrastructure and specialist engineering are moving into a clearer delivery window as a major interconnector progresses toward construction.
Civil, electrical, concrete, crane, haulage and accommodation suppliers now have a live wind farm build to position for, after the developer awarded its first delivery contract covering the high-voltage grid connection.
A regional hybrid renewable energy development combining wind generation, solar generation and battery storage has moved from site design into its formal assessment window, putting a multi-package supply chain on the radar for early positioning.
Design and construct contractors now have a live tender to price, with a regional water utility calling the market for a new water treatment plant, treated water storage, pumping and electrical systems.
Water bore drillers, pipeline installers, electrical contractors and civil earthmoving crews have a new package set forming, as a tier-one miner advances an expansion of an existing borefield that supplies a regional town and its surrounding mining operations.
A civil and hydraulic engineering contractor has been confirmed to deliver a package of environmental water infrastructure works, opening a pipeline of subcontract and supply opportunities across earthworks, structural steel, sheet piling, hydraulic works and environmental services.
Civil contractors, engineering consultancies, mechanical and electrical trades, manufacturers and specialist service providers now have an early window into a multi-year water infrastructure pipeline.
A large-scale wind and battery storage development is progressing toward its construction window, opening supplier engagement opportunities across turbine supply, civil works, electrical balance-of-plant and battery storage installation.