Proposal for $52m bulk liquids terminal at strategic industrial area south of Perth, construction start scheduled for Q2 CY2020


A proposal has been submitted for the construction and operation of a $52 million bulk liquids terminal at a strategic indust...


To read the rest of this article, please log in using the form below, or sign up now.

Log In