FEED study estimates capex of $450m for CSBP's proposed ammonium nitrate expansion project
By on November 29, 2010
,
,
,
,
CSBP Limited expects to conclude the 12-month front end engineering and design (FEED) study into the ammonium nitrate expan...
To read the rest of this article, please log in using the form below, or sign up for a free trial and explore our full range of insights. Your free trial runs for 21 days or 100 page views, whichever comes first.