Kirk Wallace

BTR residential development proposed for Fortitude Valley

With rental accommodation on the rise in Queensland, a 30-plus storey tower has been proposed for off-CBD Brisbane.

Over 40 storeys proposed for office tower at off-CBD Brisbane site

When built, the tower at Toowong will present the start of the northern gateway entrance into Brisbane’s CBD, reports Projectory.

Tower felled from the original twin-tower plan in Brisbane

Local developer blames widespread market volatility for its decision to cut one of the two 15-storey towers it had planned for Brisbane’s CBD northern fringe.

Design revealed for vital intersection upgrade on Qld Sunshine Coast

The key intersection upgrade aims to improve safety as part of the greater road infrastructure project underway on the Sunshine Coast.

TECH project proposed for north Qld advances through permits

A project seeking viability aims to become a leading supplier of high-grade, ethically-derived advanced battery materials based in Queensland.

A developer’s final piece for a riverside precinct proposed for Brisbane’s golden triangle

Projectory details the latest development to finalise a tri-tower precinct circling a heritage-listed building on the Brisbane River.

New BTR residential tower planned for Fortitude Valley

Projectory details plans proposed for a build-to-rent tower to add to the Fortitude Valley hive of residential developments.

Clearing road access for Qld’s largest eco-industrial precinct

An infrastructure masterplan for the state’s largest eco-industrial precinct was released in March, with $74 million of State and Federal funding going to the vital enabling infrastructure.

Developer finds plot for healthcare precinct on Brisbane’s northern suburbs

The healthcare-focused precinct is planned for a combined site on the north side of Brisbane, reports Projectory.

Australia’s largest wind farm to double in size creating 600 jobs for regional Qld

Already the largest wind precinct in the Southern Hemisphere, a new wind farm development is set to double the output of the MacIntyre Wind Precinct.