Configuration and timeframe detailed for $439m South Australian windfarm project
By on August 20, 2012
,
,
,
,
The configuration of a SA wind project has been revealed as the development advances to a second stage of work. TrustPower's...
To read the rest of this article, please log in using the form below, or sign up for a free 21-day trial and explore our full range of insights.